Finished in exactly two weeks; I will test them on Sagamiko tomorrow..

These two are designed to be fitted with ready-made fibreglass tips:

I wrapped the pegs with 20 metres of nylon line each, and the rods are now ready for use! My third rod – which you can see the end of in the top of the photo above – will be 100% bamboo and requires a lot more work before it is ready.
0 responses so far ↓
There are no comments yet...Kick things off by filling out the form below.